Friday, March 24, 2017

Week 28


This was a hard week. I hit a wall mentally with En Gedi, and felt 
like I just kept hitting it all week.
 
It started Monday when I arrived at En Gedi and instead of 
finding out the electrical inspector came, I found that the electrican
came ripped out half the outlets (leaving the ones I didn't ask for)
and rendering over the holes. They keep saying it has to be done 
this way. I think its foolishness, and am tired of hearing the
excuses and justifications for doing things opposite of what I have asked for
, AND 6 weeks later still no inspector has come.

 Now that she has made her hand print, she
likes to go and see if her hand still fits in it :)
 
 Monday I also went to the tile place to pick 
up the porch tiles that were supposed to be in 
2 weeks ago. When I was told they should be in
this week....and through more questions found out
they were still on a container in port....
I then asked what tiles they had in stock, ready for
me to take with me now, so we could get the porch 
finished.
 The tile we got is not my favorite, but its what
they had, and the porch got tiled.
Right now thats all I care about.
 
 I started laying out closet shelves design.
    
The walls around the tubs got tiled
 and the faucets were added
 Now we are just waiting for the bathroom counters
The doors started getting holes cut out so 
knobs can be added.
 One of the things I love about this house is all the natural light
because of all the windows.
 
 That came back to bite me this week, as I 
went to install all the brackets for the 
curtain rods.
 Supports were added to the top of the kitchen
cabinets this week, to hold up the counters that
Lord willing will arrive next week.
 
 More furniture moved in.
 
 Prep for the drive way has begun
The finishing touches of the exterior wall are just about done.

This week I gave the contractor a list of all the things that 
need to be finished up, and a time line of 2 weeks to do it, and 
encouraged him to pull in whatever extra help was needed to
get it done. 
Prayers appreciated and I have a feeling these next 2 weeks
are going to be chaos. 
Prayers also please that the electrical inspector comes and that
En Gedi is passed so we can fix back all the undoing thats been
done.
Thanks

No comments:

Post a Comment