This week there was a lot going on at En Gedi.
 The top of the perimeter wall is being finished.
 gutters were put on the house
down spouts that run into the drain.
 door frames were made and put in
 the finishing touches were done on the interior 
painting, and a few things were moved in.
 a steel box is being made to place
outside the gate to hold the garbage
 new beds were delivered this week
 as well as the kitchen cabinets
 the counter company should be here this afternoon
to take the measurements for the counters.
 the laundry room and closets were tiled
we knew we would be close on tiles so we
held off on a few rooms in case we ran out.
We were able to cover the floor and had 6 tiles left. :)
 The back porch has been blocked up, and a decking
roof poured.

1 more week and the interior should be finished!
Continued prayers appreciated.