Friday, April 28, 2017

Week 31-33

Week 31
 My sister and her family joined us
here on the island.
They spent their first few days helping us around
En Gedi.
 Adam was able to go over the plumbing
(checking to see if it was done properly)
and help finish/ fix a few problems.
 The littles were ready to help too, (in 2-5 min intervals :)
they did some sweeping,
 and wiping down walls.
 Week 32
 we all needed a break so we all loaded up in the car
and headed to Mobay for the week.

Week 33 
Cleaning up at En Gedi.
 Trying to set up shelves, and hooks to organize the stuff.
Going through piles from months of construction and figuring out what to keep,
and what to pitch.
 I am also trying to move what I can fit in the car and get it
put away.
 I also just found out, this week, that the sea container should be getting
delivered next week so I am trying to get the back porch/ garage
as cleaned up and organized as possible because I know things
coming off the sea container may need to be stored in there until we are 
moved in, and their place in the house can be found.
Inside, curtains have been hung, some things have been placed 
on the walls, tile has been scrubbed, and scrubbed, and scrubbed
to get all the mortar and grout off. And I have attempted to
remove as much concrete dust as possible. Its everywhere. 
Over everything. Not Fun.
We are now trying to find a truck and some movers to help
us move the big things from KP to En Gedi. 
Lord willing in the next week or 2 we will be fully moved.
Prayers appreciated!

Saturday, April 8, 2017

Week 30

So this was supposed to be the last week of work at
En Gedi. Sadly it won't be... maybe next week.
The outside is basically done.
  
 
 
 This week a small slab was poured
 out the back side of the house.
And finally the cabinets came in.
 The master bath
 the main bathroom
 and the kitchen.
 Because it took two days to install the 
counters, next week they will need to 
install the faucets and get all the pipes
connected.
and I got one of the cribs assembled and 
in the nursery. 

Prayers appreciated that we can get everything
done this week.
Thanks!

Saturday, April 1, 2017

Week29

 Many hands make light work. That was my plan for 
this week and next week. Pull in as many people as
needed to get all the final projects done.
 Door knobs were installed this week
 the rest of the doors were installed.
Including the beautiful front door that the
amazing craftsmen at JDV made for us!
closet doors were installed.
The back porch was painted, windows added,
(didn't get a picture of that), and one of the 
reserve tanks were pulled on top.
the concrete work was finished on the exterior wall.
 and the walls have started to be primed and painted.
 If you look in the corner where the walls meet you can see the 
change in color from the primer to the paint.
  
and this week En Gedi got a drive way.
It poured rain about every afternoon.
 
 but even that was a blessing as they saw how water ran in
with the heavy rains so they knew how to slant and form the
drive way to work with the water run off.
Standing at the house looking towards the road.
 They even crafted me a few raised flower beds with retaining walls
to hold back the slope of the dirt.
 I am excited to get some flowers in there to add some color
other than 'dirt' around here.
 One week down. One to go.
All prayers appreciated as we wrap this project up!