 This week En Gedi got its exterior painted.


 Our color options were limited with the red roof,
but I liked how this 'beach house' color turned out.
here you can see a little more of the true color when
its beside the new back porch, and the old color
of the house.
The outside and inside of the new back porch has been
rough casted
 and rendered so hopefully next week it can be
 painted. and windows installed.
 This other bathtub was brought over from JDV
 
 and both were put in place.
Lord willing next week the tile will be added around
the tubs and the bathrooms should be about done!
 Proper covers were installed on our drainage pipes 
outside.
 doors have started to be installed inside.
 and we have a lot of supplies ready for next week.
 We have a team from Iowa that has come the last 
few years, and they asked if next week there was
a way they could be running along side En Gedi.
We humbly accepted there offer and so a group of 15
or so will be spending there week helping us pour
outdoor concrete slabs around the outside of  
En Gedi.
Countertops were ordered this week and will take
a week or two, to have made and installed,
tile work around the tubs, countertops installed,
and a few more doors to hang up and En Gedi's 
interior should be done.
Lord willing by the end of March En Gedi House
construction part will be finished!