Saturday, April 1, 2017

Week29

 Many hands make light work. That was my plan for 
this week and next week. Pull in as many people as
needed to get all the final projects done.
 Door knobs were installed this week
 the rest of the doors were installed.
Including the beautiful front door that the
amazing craftsmen at JDV made for us!
closet doors were installed.
The back porch was painted, windows added,
(didn't get a picture of that), and one of the 
reserve tanks were pulled on top.
the concrete work was finished on the exterior wall.
 and the walls have started to be primed and painted.
 If you look in the corner where the walls meet you can see the 
change in color from the primer to the paint.
  
and this week En Gedi got a drive way.
It poured rain about every afternoon.
 
 but even that was a blessing as they saw how water ran in
with the heavy rains so they knew how to slant and form the
drive way to work with the water run off.
Standing at the house looking towards the road.
 They even crafted me a few raised flower beds with retaining walls
to hold back the slope of the dirt.
 I am excited to get some flowers in there to add some color
other than 'dirt' around here.
 One week down. One to go.
All prayers appreciated as we wrap this project up!