 The porch is now finished except for the tile.
 My bedroom is now done.
 The cabinets are now partly in the bathroom.
  
 we are now just awaiting the arrival of the kitchen cabinets so
we can order the counter tops.
 
 The color in the master bedroom beside the color throughout
the living areas of the house.
(a door jam will separate them)
Neiah LOVES the rainbow wall in her room
it was her only request.... so far :)
 grouting the floor in the nursery
 The room just needs to be painted and then
it will be done.
 The dining room tile is now layed and the
grate door taken off and re positioned.
   
All the tile is in except the living room, spare room, and porch.
3 more rooms to go!
 We now have a garage door

The garage is now done!
 The back porch was pulled down this week.
 The foundation was kept, and block walls were added. This
way we can deck the roof and put our big water tanks on 
top for back up water if our water gets shut off.
 The college side of the wall is just about all rendered.

 The front entrance is now done.
Continued Prayers appreciated.