Friday, January 27, 2017

Week 20


Lots going on inside and outside this week.
 The new electrical pole was finished and 
all electrical (Lord willing we will see
after the inspection) is done.
The electrical lines going from the new pole
to the the house have been run and burried
underground.
 I now have 8 of these surrounding the outside of the house.
So with the flip of a switch my yard will now be lit up like 
a stadium (as per the request of my uncle and father:)
 The perimeter wall is being rough casted.
 The drain (to carry water away from the house)
has been started.
They are pouring a little slab where a gate
in the fence will go so there is a connection
to the bible college next door to us. 

Inside they are working on the ceilings and the floors.
 the dining room ceiling is finished.
 Neiah's room sanded down and sealed.
The master bedroom ceiling sanded and sealed.
The tile was delivered this week
The floors 'chopped' up so the thin set will stick when the new
tile is laid.
 the new tile starting to be laid!

Another week closer to being done.
Continued prayers appreciated.
Thanks!