This will be my final 'weekly update' for a while. This morning
I handed off the project to Adrian and Ben (missionary at JDV)
for the next month as Neiah and I fly to the states next week.
This break will be welcome, but I am going to miss being apart
of the day to day changes and check ins.
This week they started to back fill the old septic
tank with stuff coming out of the house.
All the floors that were dug up last week to put in
the new plumbing pipes have been filled in and
repoured.
the master bath basically got a new floor poured
as pipes were added and the toilet and sink were
moved around.
The pipes for the kitchen sink were put in and the
floor fixed back.
all the electrical cuts were made.
the new boxes were put in and the wires pulled.
Now we are just waiting for the guys to come
put in the new ceiling so they can run the wires over
the top of the ceiling.
the electical box from the house to
the electric meter was put in,
and they started digging the trench from
the house to the meter pole.
the rest of the old windows have been removed,
and the holes have been modified to fit the new
windows.
the rest of the windows were installed on one side
of the hosue
and all the back windows were installed.
the steel grates (that were pulled off the outside of the
house to remove the windows), are being remodified,
strengthend, and will attach to the windows inside the house.
(so when you look at the house from the outside you
wont see bars on all the windows)
All the windows now in, and grates ready to be
attached in Neiah's room.
Please be praying for Sweet P, as she will be
going into tempory care when Neiah and I
travel to the states next week. She is not the
easiest baby, so prayers for a smooth transition
for her, and for all the aunties that will be caring
for her while we are away, would be appreciated.
Thanks
No comments:
Post a Comment