Wednesday, November 30, 2016

Week 11


This week it didn't look like a lot got done... but it did.
 The final few posts on the exterior wall were poured.
 Last week they started taking out windows and framing them
back up so the new windows can be put in.
All the front windows and one of the sides of the house were 
pulled out and the windows were framed up and ready for the
new windows to be put in.
This week, tile was picked out.... then returned when I
started having to many doubts about my option. And then I was
able to find one (thanks to face time and help from my sister)
that I really like.
Also, Nigel and Ben came over from JDV to figure out the
layout of cabinets (and other wood furniture) that will be
needed at En Gedi.

Saturday, November 19, 2016

Week 10

 This week the rest of the interior walls being torn down, came down.
 the added areas were rough casted and rendered.
 the view from the kitchen into the living room and dining room.
 looking into the kitchen from the living room.
 the kitchen window blocked up some, and rough casted.
 looking from the dining room into the kitchen.
 the view from down the hallway into the new open dining room.
 the closet wall in the nursery torn out (mostly) to give us a bigger
bathroom.
 the view in the bathroom, the shower torn out, and the nursery
will still have a small closet.
 a double door blocked up in the extra office, spare bedroom, 
storage room (TBD:).
 Putting backfill  in low lying areas so water doesn't settle 
around the house.
 

 the garage and porch floor filled with backfill so its ready to 
have concrete poured.
little miss hanging out while I am walking around the house trying
to make decisions :)

Monday, November 14, 2016

Week 9

 We now have a new Roof!
 they started to rough cast the garage/porch addition of the house.
 How the house looks from the gate.
(Once again I am SO thankful we decided to extend the roof
to over the garage too. It looks great!)
 the front & inside of the garage/ porch rough casted.
 most of the columns on the front wall have now been poured.
 Walls started to come down inside the house.
 the archway/ beam going in between the kitchen and dining room.
 the view looking from the living room into the new porch/ garage.
 looking out the front door into the porch/ garage.
 the wall cut out between the kitchen and living room.
(just one more wall to get rid of!)
Thursday afternoon, we got a call from CDA asking if we could
love on a week old little girl. By Friday afternoon she was able to
come home with us. Prayers appriciated for Petrona (aka Sweetie P)
and her bio family. 

Yesterday was family picture day at Church
so Sweetie P got her pictures taken too.


Blessings.

Saturday, November 5, 2016

Week 8

 Putting the steal in for the garage.
 Footers poured on the new garage
 and by the end of the week we had a new garage.
 cross beam poured so the roofers could frame it.
 The roofers came this week, and we had a team come from 
JDV to help pull down the ceiling, and other demo.
 Ceiling gone, and the back part of the roof removed.
 The floor covered with...everything coming down.
 The team removing kitchen cabinets, and tile on the walls.
 The old back part of the roof removed and the new roof framed.
 Friday morning the roof was just about all framed.
We made a last min. change to roof the garage too. The previous 
plan was to simply deck it (pour a concrete slab on top for the roof)
so that we could put the black tanks (water storage) on top and 
they could then gravity feed down to the house. They were going
to do this because as you can see with the guy standing there, and 
the ground elevation, the roof on the garage is really low.
 a solution was found for the lowness, and I am so thankful we
made this change. I love the way it looks, and now when
you come in the first thing you won't see is two big black tanks
sitting on the roof. :)
This week felt "Big" so much changed so quickly. I continue
to praise God for all the people he has placed here to run along
side us in this project.